Description
The Guttering SWMS references all of the relevant legislation, Codes of Practice, and Australian Standards for your state of operations. The SWMS outlines all of the job steps, risks, and controls. It is in Microsoft word format and is fully editable. The SWMS will be available for download Instantly once purchased. The SWMS has been written in consultation with industry workers and WHS Qualified personnel to ensure a comprehensive document is in place. The SWMS covers the following job steps:
- Unaware of Hazards
- Site Induction and entry to work area
- Prestart Meeting
- Secure the site and setup for
- the job
- Vehicle Collision
- Analyse the job.
- General things to check.
- Weather Conditions
- Electrical
- Chemicals Storage and Usage
- Deliveries to site
- Move equipment etc. to work area
- Working at Heights
- Use of EWP
- EWP Rescue Plan
- Scaffold erection
- Scaffold use
- Guttering
- Use of Power Tools
- Working near live electrical services
- Removing Old Guttering
- Fitting guttering.
- Site clean-up and waste disposal
Reviews
There are no reviews yet.