Description
The Trenching and Excavation SWMS references all of the relevant legislation, Codes of Practice and Australian Standards for your state of operations. The SWMS outlines all of the job steps, risks and controls. It is in Microsoft word format and is fully editable. The SWMS will be available for download Instantly once purchased. The SWMS has been written in consultation with industry workers and WHS Qualified personnel to ensure a comprehensive document is in place. The SWMS covers the following job steps:
- Planning
- Unaware of Hazards
- Prior to commencing work
- Site Preparation
- Pre-start checks of plant
- Entering & Exiting Mobile Plant
- Operator Position & Controls
- Unloading mobile plant from float/truck
- Mobilisation of Excavator to site
- Mark out line of trench
- Delivery and storage of shoring
- Pre-operation
- Overhead and Underground Hazards
- Moving Excavator on worksite
- General Operation of Excavator
- Working or traversing on sloping ground
- Dig trench/Excavating
- Using an Auger attachment
- Using a Compaction Wheel
- Using quick hitch and attachments on plant
- Working plant with Rock Breaker or Grab Attachment
- Remove Shoring and Backfill Trench
- Refuelling on site
- Loading plant on to float/truck
- Completion of work or end of workday
Reviews
There are no reviews yet.