Description
The Excavation and Drainage SWMS references all of the relevant legislation, Codes of Practice, and Australian Standards for your state of operations. The SWMS outlines all of the job steps, risks, and controls. It is in Microsoft word format and is fully editable. The SWMS will be available for download Instantly once purchased. The SWMS has been written in consultation with industry workers and WHS Qualified personnel to ensure a comprehensive document is in place. The SWMS covers the following job steps:
- Unaware of Hazards
- Weather Conditions
- Electrical
Chemicals Storage and Usage - Asbestos Awareness
- Deliveries to site
- Unloading of plant on site
- Move equipment etc. to work area
- Concealed Services and Hazards
- Site Preparation
- Climbing into plant
- Plant operation
- Dig Trenches
- Refuelling Plant
- Use of Power Tools
- Internal Drainage
- Installation of internal water service and drainage
- Installation of external drainage and sewer – Placement of blue metal bedding
- Installation of external drainage and sewer – Sling pipes and pits at ground level
- Lift Pipe into trench
- Remove lifting equipment and connect Pipework
- Testing (hydrostatic)
- Backfill and consolidate
- Packing up
- Housekeeping
- Removal of material from site
Reviews
There are no reviews yet.