Risk Register – Mechanical Workshop (Instant Download)

$220.00 inc. GST

The Risk Register – Mechanical Workshop references all of the relevant legislation, codes of practice and Australian standards as required for all states within Australia.

It is easy to edit – Simply add your company information and remove the state legislation that does not apply.

SKU: 1497-123 Categories: , ,

The Risk Register - Mechanical Workshop references all of the relevant legislation, Codes of Practice and Australian Standards for your state of operations.

The SWMS outlines all of the job steps, risks and controls.  It is in Microsoft word format and is fully editable. The SWMS will be available for download Instantly once purchased.

The SWMS has been written in consultation with industry workers and WHS Qualified personnel to ensure a comprehensive document is in place.

The Risk Register covers the following:

  1. General Plant and Equipment Safety
  2. Electrical Equipment
  3. Other workers
  4. Noise
  5. Moving parts
  6. Hot Works/Hot fluids and materials
  7. Fumes/Noxious Gas
  8. Hydraulic Fluids
  9. Crush and Pinch points
  10. Machine failure
  11. Eye hazards
  12. Unauthorised use
  13. Use of Power Tools
  14. Pre-operation Inspection of Power Tools
  15. Use of tools-Entanglement
  16. Use of power tools -Impact and Cutting Injuries
  17. Use of power tools -Noise
  18. Use of power tools - Vibrations
  19. Use of power tools - General
  20. Chemicals
  21. Use of chemicals
  22. Cleaning up
  23. Storage
  24. Angle Grinders
  25. Soldering
  26. Working with Solder
  27. Air Tools and equipment using compressed air
  28. Using compressor or air powered tools and equipment
  29. Welding and cutting
  30. Welding
  31. Preparation
  32. Welding
  33. Oxy Welding and Cutting
  34. Forklift
  35. Use of forklift
  36. Contact with overhead hazards
  37. Use of a Work Box on forklift to carry workers
  38. Refuelling Forklift
  39. Gantry Crane
  40. Preparation of Gantry Crane and working area.
  41. Pre-start check of crane and work area
  42. Check Load
  43. Position and Secure Hook
  44. Move load
  45. General Operation of Gantry Crane
  46. Place Load
  47. Return lifting equipment to safe condition
  48. Undertaking servicing of a vehicle/truck
  49. Driving vehicle to hoist
  50. Lifting Hoist
  51. Working on vehicle whilst on hoist
  52. Lowering hoist
  53. Changing Tyre
  54. Vehicle Setup
  55. Undoing wheel nuts and removing tyre
  56. Use of rattle gun
  57. Release Pressure on Spyder Rim
  58. Pumping tyre up after repair
  59. Lifting new tyre
  60. Ladder Use
  61. Use of ladder for access
  62. Workshop Risks - General
  63. Use of PPE
  64. Use of Chemicals
  65. Manual Handling
  66. Access/Housekeeping
  67. Office Risks
  68. Working with computers
  69. Working with shredders, laminators, guillotines
  70. Housekeeping -
  71. obstacles and cluttered work areas
  72. Manual Handling – Lifting

Additional information

State

ACT, All States, NSW, NT, QLD, SA, TAS, VIC, WA

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

The Working at Heights SWMS references all of the relevant Legislation, Codes of Practice and Australian Standards for your state of operations.

The SWMS outlines all of the job steps, risks and controls.  It is in Microsoft word format, and is fully editable.

The SWMS has been written in consultation with industry workers and WHS Qualified personnel to ensure a comprehensive document is in place.

G'day & Welcome

I'm stoked you found us. 

 

We believe some things are better hard - but safety isn't one of them. Opt in to our mailing list to receive our free newsletter - we also offer a free monthly done-for-you toolbox talk. 


Can't wait to catch up soon!

You have Successfully Subscribed!

Industry PackagesMechanicRisk Register – Mechanical Workshop (Instant Download)